I’m still under a lot of stress.
The good news, is that the roof is up, paid for, and we’re waiting for insurance reimbursement.
The floor is ordered, but on back order, and they are pulling up the old floor on Friday — school is out for fair day. We’ll put down the new floor when it comes.
For those new to the blog, as soon as I ordered and got the pump, the A/C went out, to the tune of $500 and floored the dining room running the parquet floor which stretches about 3/4 of the house.
We then discovered that the roof was damaged.
And THEN the husband broke his hip.
I’m still worried to death over him and his exploits. He is becoming more mobile which makes me worry more, but at least I don’t have to expend as much energy in his direction. Of course, that means I have no help in getting ready for the floor.
As a result of all this stress, I’m not sleeping well, but am slowly getting back to normal. Eating more as a result of being tired all the time, so using more insulin.