They have doing the drywall.
They probably finished carpeting Rich’s bedroom (that was the plan when we left).
We need to schedule an inspection with the bank (I remember reading something about Wednesday on that, but don’t know.
They need to paint. Put down flooring in the whole house and put the brick up. Also put up the electrical fixtures.
Leave a Reply to Richard B. Cancel reply